advanced air quality

profiletopcats2017

need tomorrow only one page 

Unit V Mini Project As a continuation of our course project due in Unit VIII, A Permit By Rule (PBR) Application for an Interior Surface Coating Facility, complete the next section, “Operational Face and Filter Velocities,” of your proposal by following the instructions carefully, and then submit your continued draft for grading. MEE 6501, Advanced Air Quality Control 5 Instructions 1. Closely read the Required Reading assignment from your textbook, the TCEQ (2011) document, and the Unit Lesson in the Study Guide. 2. Open your proposal draft from Unit IV and make any improvements to your draft using your professor’s feedback from the Unit IV project assignment. 3. Open the Unit V Study Guide, read the Unit V Lesson, then review the calculations demonstrated and explained regarding face velocity calculations and filter velocity calculations for our scenario. 4. Make your Unit V work your fourth level 1 heading titled “Operational Face and Filter Velocities.” Describe and demonstrate (illustrate) the calculations for the following for this section of your project: (a) calculate the face velocity and (b) filter velocity of the spray booth in a minimum one-page, double-spaced document. Information about accessing the Grading Rubric for this assignment is provided below

  • 6 years ago
  • 5
Answer(1)

Purchase the answer to view it

blurred-text
  • attachment
    OPERATIONALFACEANDFILTERVELOCITIES.doc
  • attachment
    advancedairquality.pdf