Computer Applications Microsoft Excel 2016 Graded Project Section 4.1

profileSerenity3203
CreateaSpreadsheet.docx

READING ASSIGNMENT

Your project must be submitted as an Excel workbook (.xlsx, .xls). Your project will be individually graded by your instructor and therefore may take up to five to seven days to grade.

Be sure that each of your files contains the following information:

· Your name

· Your student ID number

· The exam number

· Your email address

Note:  If you have more than 10 attachments, you’ll need to collect all of your files into a compressed folder. To do this, follow these instructions based on your operating system:

· Windows: Select the files you want to compress, right-click and select Send to. . . and then Compressed (zipped) folder

· Mac: Select the files you want to compress, control-click and select Compress

To submit your graded project, follow these steps:

· Log in to your student portal.

· Click on Take Exam next to the lesson you’re working on.

· Find the exam number for your project at the top of the Project Upload page.

· Follow the instructions provided to complete your exam.

Be sure to keep a backup copy of any files you submit to the school!

Introduction

This project requires you to develop a spreadsheet that tracks the cost of elementary school supplies distributed to teachers over a two-month period. You’ll assume the role of Office Manager, who has multiple responsibilities, including distributing and maintaining classroom supplies. For this project, you must prepare an Excel spreadsheet and chart that will be sent to the school District Manager.

Instructions

Create a Spreadsheet

1. Start Excel and create a new workbook.

2. Enter data as shown in Figure below, sizing columns as necessary, and then save your file, naming it School Supplies.

An image of a new excel workbook with data entered and named School Supplies.

3. Merge and center cells A1 through H1. Format the school name as Title style.

4. Merge and center cells A2 through H2. Format the label as Heading 1 style.

5. Bold the labels in row 4 and right align the labels above numeric values.

6. Format the Cost/Unit values as Currency with 2 decimal places. Your spreadsheet should look like Figure below.

An image of the School Supplies excel workbook with formatted data.

7. In column D, enter appropriate formulas to calculate the September costs for each school supply. Your formulas must use cell references. Format the calculated values as Currency with 2 decimal places.

8. In cell A16, enter the label “Grand Total” and then format it as bold.

9. In cell D16, enter a formula that uses a function to calculate the total of the column.

10. In column E, enter formulas that calculate the percentage of the grand total for each type of school supply (total cost of each item divided by the grand total). Your formulas must use appropriate absolute cell references. Format the calculated values as Percentage with 0 decimal places.

11. In cell E16, enter a formula that uses a function to calculate the total of the column (it should total 100%).

12. Repeat the process you used in steps 7–11 to calculate values for October.

13. Sort the school supplies alphabetically. (Be sure to select cells A5:H14 to sort the entire row of data.) Your spreadsheet should look similar to Figure below.

An image of the School Supplies excel workbook with the data sorted in alphabetical order.

14. Save the modified spreadsheet.

Create a Chart

1. Create a chart by first selecting the cell ranges for the chart. Drag from cell A4 to A14 to select the range and then press and hold the Ctrl key while you drag from cell D4 to D14. Continue to press and hold the Ctrl key while dragging from cell G4 to G14. Your selected cells should look like Figure below.

An image of selected cell ranges in the School Supplies excel workbook.

2. Insert a 3-D Clustered Column chart.

3. Change the chart title to read “Cost of Supplies.”

4. Position the chart with the upper-left corner in cell A18 and then size the chart until it extends to column H, as shown in Figure below.

An image of a chart made with the selected cell ranges in the School Supplies excel workbook.

5. Put the following information into cell A41:

· Your name

· Your email address

· Your student number

· Course name and number

· Project number (584801)

6. Save and close the workbook.

Scoring Guidelines

Rubric

Skill/ Grading Criteria

Exemplary (4)

Proficient (3)

Fair (2)

Poor (1)

Not Evident (0)

Enter data

The correct data has been entered into the appropriate cells.

Most of the correct data has been entered into the appropriate cells.

Some of the correct data has been entered into the appropriate cells.

Minimal correct data has been entered anywhere.

No attempt has been made to enter data into the spreadsheet.

Size columns

All columns are sized to appropriately display labels and values.

Some columns are sized to appropriately display labels and values.

Few columns are sized to appropriately display labels and values.

Only one column is sized to appropriately display labels and values.

No attempt has been made to change column widths.

Apply an Excel style

All cells are in the indicated style.

All cells have a style applied, but they are in the wrong style.

One cell has an applied style, in the indicated style.

One cell has an applied style, but it is the wrong style.

No attempt has been made to apply Excel styles.

Merge and center cells

Labels in rows 1 and 2 have been merged and centered above the appropriate cells.

The label in one row has been merged and centered.

Labels in either row 1 or 2 have been merged without centering.

An attempt has been made to center labels above the data.

No attempt to merge cells or center labels has been made.

Format labels

The appropriate labels have been formatted as instructed.

Some of the appropriate labels have been formatted as instructed.

Appropriate labels have some formatting but may not be as instructed.

Some labels have been formatted.

No attempt to format labels has been made.

Format values as Currency

The appropriate values have been formatted as Currency with 2 decimal places.

The appropriate values have been formatted as Currency without 2 decimal places.

The appropriate values display a $ but have not been formatted as Currency.

The wrong values have been formatted as Currency.

No attempt has been made to format values as Currency.

Format values as Percentage

The appropriate values have been formatted as Percentage with 0 decimal places.

The appropriate values have been formatted as Percentage displaying a decimal portion.

The appropriate values display a % but have not been formatted as Percentage.

The wrong values have been formatted as Percentage.

No attempt has been made to format values as Percentage.

Use formulas with relative cell references

All Cost values have been calculated using 2 relative cell references.

Cost values have been calculated using 1 relative cell reference.

N/A

N/A

Cost values do not use any cell references.

Use formulas with functions

All Grand Total values have been calculated using a SUM function.

N/A

Grand Total values have been calculated using a SUM function but did not include all cell references.

N/A

Grand Total values have not been calculated with a SUM function.

Use formulas with absolute cell references

The % of Grand Total values have been calculated with a formula that includes an absolute cell reference.

N/A

N/A

N/A

The % of Grand Total values have not been calculated using absolute cell references.

Sort data

Supply data (rows 5 through 14) has been sorted alphabetically by supply name.

Supply data (rows 5 through 14) has been sorted in reverse alphabetical order or by something other than supply name.

N/A

Only the Supply data in column A has been sorted, making the spreadsheet data inaccurate.

No attempt has been made to sort the data.

Create a chart

A 3-D Column chart has been created using the correct data.

A chart of any type has been created using the correct data.

A chart has been created using some of the correct data.

An attempt to create a chart has been made.

No attempt has been made to create a chart.

Edit a chart title

The chart title has been appropriately changed.

The chart title has been changed to unspecified text.

N/A

An attempt has been made to change the chart title.

No attempt has been made to change the chart title.

Move and size a chart

The chart has been moved and sized to the specified location and dimensions.

The chart has been moved to the specified location or sized, but not both.

N/A

N/A

No attempt has been made to move or size the chart.

Submission Checklist

Before submitting your project, make sure you’ve correctly completed the following:

· Create, save, and name an Excel file.

· Enter data and labels.

· Format labels with indicated styles.

· Merge and center labels.

· Format data with Currency and Percentage formats to the correct number of decimal places.

· Size columns appropriately.

· Use formulas that include a function where applicable.

· Use relative and absolute cell references in formulas.

· Sort data.

· Create a chart from nonadjacent data.

· Edit a chart.