Risk Management

profilembfffiri24

Risk Management Project 2
 
In this project, you will be given the opportunity to demonstrate your understanding of the risk management concepts covered in this and previous units in the course. 
 
Select a real or imagined workplace setting that involves hazards created by two or more of the hazard sources discussed in Chapters 14-27. Your assignment is to identify and assess the risks in this workplace, propose tactics for reducing the risks, and evaluate the residual risks. Your submission should include the following:
 
 A brief description of the workplace setting and an explanation of the tasks in this workplace.   Identification of hazards and risks in the workplace; Job Hazard Analysis (JHA), Failure Modes and Effects Analysis (FMEA), or Fault Tree Analysis are to be used, or some combination of these techniques.   Assessment of the identified risks before risk reduction efforts are applied, using a 5x5 Risk Assessment Matrix.  Identification of risk reduction tactics to be applied with a brief justification for each tactic selected; multiple tactics can be applied to each risk if needed.   Re-assessment of the risks after tactics are applied, using a 5X5 matrix.  Discussion of the residual risks, and whether you feel they are at a tolerable level. 
 
The project must be a minimum of four pages, and a maximum of seven pages in length, not including the title, abstract, and reference pages. Use APA formatting where applicable.

No plagerism

    • 7 years ago
    • 30
    Answer(3)

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      reduction_of_risks_at_workplace.docx

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      reduction_of_risks_at_workplace_risk_management_unit_viii_course_project.doc

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      risk_2.docx