Review the project case. Determine the scope of the District 4 Production Warehouse Move project from the information provided in the case. Using the Project Scope Checklist, prepare a scope document for review and approval by the project sponsor prior to starting the project.

Project Scope Checklist

  1. Project objective
  2. Deliverables
  3. Milestones
  4. Technical requirements
  5. Limits and exclusions
  6. Reviews with customer

Submit your report to M1: Assignment 3 Dropbox by Wednesday, November 27, 2013.

Assignment 3 Grading Criteria
Maximum Points

Prepared a project scope document that is ready for sign-off.

30

Determined the complete scope of the project.

30

Included all sections from the scope checklist.

30
Used correct grammar, spelling, and word choice and cited all sources using correct APA style.
10
Total:
100

 

PROJECT OBJECTIVE

To construct a high-quality, custom home within five months at cost not to exceed $350,000.

DELIVERABLES

• A 2,200-square-foot, 2½-bath, 3-bedroom, finished home.

• A finished garage, insulated and sheetrocked.

• Kitchen appliances to include range, oven, microwave, and dishwasher.

• High-efficiency gas furnace with programmable thermostat.

MILESTONES

1. Permits approved—March 5

2. Foundation poured—March 14

3. Drywall in. Framing, sheathing, plumbing, electrical, and mechanical inspections passed—May 25

4. Final inspection—June 7

TECHNICAL REQUIREMENTS

Page

1. Home must meet local building codes.

2. All windows and doors must pass NFRC class 40 energy ratings.

3. Exterior wall insulation must meet an “R” factor of 21.

4. Ceiling insulation must meet an “R” factor of 38.

5. Floor insulation must meet an “R” factor of 25.

6. Garage will accommodate two large-size cars and one 20-foot Winnebago.

7. Structure must pass seismic stability codes.

LIMITS AND EXCLUSIONS

 

1. The home will be built to the specifications and design of the original blue

    • 9 years ago
    • 20
    Answer(2)

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      mgt_402_unit_1_module_1_assignment_3_defining_the_project_scope_answer.docx

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      project-scope__final.docx
    Bids(0)