MGT 496 D2

profileilucou

Review Case Study 5.1: Live Racking at B.M.W. found in Chapter 5 of the text.  Assume that you are the warehouse director for B.M.W.  B.M.W. has learned that the 39-second cycle time described in the case is inadequate for 21st century operations and has asked you to reduce the cycle time down to 30 seconds or less. In 200-300 words, identify a technique described in Chapter 4 or 5 that could potentially be used to reduce cycle time down to 30 seconds or less. Respond to at least two of your classmates’ posts. 

    • 8 years ago
    • 5
    Answer(1)

    Purchase the answer to view it

    blurred-text
    • attachment
      bmw.doc
    Bids(1)