Literature review for the term paper: Project Managers and Leadership, Ethics, and Technology

profileamaisi

Literature review for the term paper: Project Managers and Leadership, Ethics, and Technology

Due Week 4 and worth 100 points

This assignment a document to be delivered in a word processor document format. Write a two to three (2-3) page paper covering:

  1. The context of your paper.
  2. The contribution of the paper to the Literature.
  3. The gap in the Literature.

Overview

This is one of the most important steps to help you prepare for the term paper. The goal for the literature review is to understand what is already published about Project Managers and Leadership, Ethics, and Technology. You should use the library for this assignment extensively. The literature review should include the following parts.

Context of your outline. You need to explain the context of the points in your outline using the perspectives presented by the literature. You should expect several cited sources to appear here.

Contribution of the paper to the Literature. You need to explain how your paper contributes to the literature surrounding your outline.

Explain how you expect the paper to contribute knowledge and insight into the context supporting the topic. Remember, every topic has supporting context—without it, you do not have the people and processes allowing the topic to exist. So, make sure you have a contribution as to help others enhance their understanding of the topic.

Gap in the Literature. Explain how your paper fills in a missing segment (or gap) in the literature. Your unique perspective will contribute something new. Describe that niche here and how it helps build upon previous literature. 

Your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
    • 7 years ago
    • 40
    Answer(4)

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      project_managers_and_leadership1.docx
    • attachment
      smallseotools-1486327347.pdf

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      software_design.docx

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      project_managers_and_leadership_ethics_and_technology.doc

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      TermPaperProjectManagersandEthicsLeadershipandTechnology.docx