BSOP 429 Week 4 Midterm Exam - Set 1...............(BSOP 429 Production Activity Control & Just-in-Time with Lab - DeVry)

profileGuide4Students
 (Not rated)
 (Not rated)
Chat
  • Page 1 

1. (TCO 12) _____ is the objective under JIT and time-based competition. (Points : 5)
 2. (TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system? (Points : 5)
3. (TCO 3) What happens to inventory as the number of kanban cards increases? (Points : 5)
4. (TCO 1) In managing supplier relations, which of the following is a beneficial setup? (Points : 5)
5. (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered? (Points : 5)
6. (TCO 9) Which of the following is true? (Points : 5)
7. (TCO 4) According to Elyahu Goldratt, the TOC system uses a scheduling approach called _____. (Points : 5)
8. (TCO 5) The amount of time covered by the basic MRP record is called the _____. (Points : 5)

  • Page 2

1. (TCO 1) Please explain PAC. (Points : 20)
2. (TCO 2) How does input from other areas into PAC and the feedback PAC provides impact PAC? Explain. (Points : 20)
3. (TCO 6) Discuss the differences between MRP and JIT. (Points : 20)

    • 10 years ago
    BSOP 429 Week 4 Midterm Exam - Set 1
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      bsop_429_week_4_midterm_exam_set_1.doc