BSOP 429 Production Activity Control Week 4 Midterm Exam Set 2 Devry
Advised (Not rated)
(Not rated)
BSOP 429 Week 4 Midterm Exam Set 2
Multiple Choice
- (TCO 12) Formal systems for shop floor control under JIT are _____.
- (TCO 2) An operation setback chart _____.
- (TCO 3) In order to minimize the number of orders waiting in the queue and maximize the number of orders processed in a center, which of the following rules should be used?
- (TCO 1) Which of the following is true?
- (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered?
- (TCO 9) Which of the following is true?
- (TCO 4) How much of total lead time is accounted for by queue time?
- (TCO 5) Gross requirements in an MRP record are _____ because they are stated as unique items for a given period.
Essay Type
- (TCO 1) List and briefly discuss the five main parts of the operations planning control (OPC) system.
- (TCO 2) What information should be provided into PAC as feedback and why they are important?
- (TCO 6) Compare and contrast JIT and MRP.
- 8 years ago
BSOP 429 Production Activity Control Week 4 Midterm Exam Set 2 Devry
NOT RATED
Purchase the answer to view it
- bsop_429_week_4_midterm_exam_set_2.doc