BSOP 429 Production Activity Control Week 4 Midterm Exam Set 1 Devry

profileAdvised
 (Not rated)
 (Not rated)
Chat

BSOP 429 Week 4 Midterm Exam Set 1

 

Page 1

  1. (TCO 12) _____ is the objective under JIT and time-based competition. (Points : 5)
  2. (TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system? (Points : 5)
  3. (TCO 3) What happens to inventory as the number of kanban cards increases? (Points : 5)
  4. (TCO 1) In managing supplier relations, which of the following is a beneficial setup? (Points : 5)
  5. (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered? (Points : 5)
  6. (TCO 9) Which of the following is true? (Points : 5)
  7. (TCO 4) According to Elyahu Goldratt, the TOC system uses a scheduling approach called _____. (Points : 5)
  8. (TCO 5) The amount of time covered by the basic MRP record is called the _____. (Points : 5)

Page 2

  1. (TCO 1) Please explain PAC. (Points : 20)
  2. (TCO 2) How does input from other areas into PAC and the feedback PAC provides impact PAC? Explain. (Points : 20)
  3. (TCO 6) Discuss the differences between MRP and JIT. (Points : 20)
    • 8 years ago
    BSOP 429 Production Activity Control Week 4 Midterm Exam Set 1 Devry
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      bsop_429_week_4_midterm_exam_set_1.doc